What Should You Expect During Tile Flooring Installation?

Tile flooring installation is one of the most labor-intensive flooring projects. After decades of installing tile in Oklahoma homes, we explain what homeowners should realistically expect during the process.

Project Timeline

  • Duration — typically 2-5 days depending on room size and complexity.
  • Preparation — surface preparation may add time.
  • Mortar cure — 24-48 hours before grouting.
  • Grout cure — 24-72 hours before foot traffic.
  • Full cure — 28 days for full cure.

Normal Conditions

  • Dust — significant dust from demolition and cutting.
  • Noise — saws, hammers, and grinders are loud.
  • Odor — mortar and grout have mild odor.
  • Room closure — the room must remain off-limits during cure.

Surface Preparation

  • Substrate — the substrate must be clean, flat, dry, and structurally sound.
  • Concrete — concrete must be flat and free of cracks.
  • Wood subfloor — wood subfloors may require cement board or uncoupling membrane.
  • Crack isolation — crack isolation membrane may be needed on concrete.
  • Self-leveling — uneven concrete may require self-leveling compound.

Crack Treatment

  • Existing cracks — cracks in concrete should be treated before tiling.
  • Crack isolation membrane — prevents cracks from telegraphing through tile.
  • Expansion joints — large areas require expansion joints.
  • Manufacturer requirements — follow the membrane manufacturer's specifications.

Layout

  • Direction — the installer lays tile in the agreed direction.
  • Starting point — the installer starts at the most visible wall or center.
  • Pattern — the installer lays out the pattern (straight, diagonal, herringbone).
  • Homeowner approval — the homeowner should approve the layout before setting.
  • Cuts — the installer plans cuts to avoid small slivers at edges.

Cutting

  • Wet saw — tile is cut with a wet saw to reduce dust.
  • Silica dust — cutting generates silica dust; wet saws reduce this.
  • Notches — notches and complex cuts are made with nippers or a grinder.
  • Holes — holes for pipes and fixtures are drilled with diamond bits.

Mortar

  • Thinset — thinset mortar is troweled onto the substrate.
  • Notched trowel — a notched trowel creates ridges for even coverage.
  • Back-buttering — large tile may be back-buttered for full coverage.
  • Open time — thinset has open time; tile must be set before it skins over.
  • Cure — thinset requires 24-48 hours before grouting.

Lippage Control

  • What it is — lippage is the height difference between adjacent tiles.
  • Cause — lippage is caused by uneven substrate, thinset coverage, or tile variation.
  • Prevention — lippage control systems (clips and wedges) minimize lippage.
  • Large format tile — large format tile is more prone to lippage.
  • Acceptable limits — industry standards specify acceptable lippage.

Grouting

  • Timing — grouting occurs 24-48 hours after tile setting.
  • Mixing — grout is mixed with water to the right consistency.
  • Application — grout is pressed into joints with a float.
  • Cleaning — excess grout is wiped off with a damp sponge.
  • Haze — grout haze is removed after initial set.

Movement Joints

  • Perimeter — a movement joint (sealed with silicone) is needed at the perimeter.
  • Doorways — movement joints at doorways and transitions.
  • Large areas — large areas require movement joints every 24-36 feet.
  • Sealant — 100% silicone sealant, not grout, at movement joints.

Cure Times

  • Mortar — 24-48 hours before grouting and foot traffic.
  • Grout — 24-72 hours before foot traffic.
  • Sealing — wait 72 hours before sealing grout.
  • Full cure — 28 days for full mortar and grout cure.
  • Water exposure — avoid water on the floor for 7 days after grouting.

Cleanup

  • Grout haze — the installer removes grout haze with a haze remover.
  • Sweeping — the installer sweeps the floor.
  • Debris — demolition debris is hauled away (if contracted).
  • Final inspection — the homeowner and installer inspect the work.

Conditions That Require Attention

  • Hollow tiles — hollow-sounding tiles indicate poor mortar coverage.
  • Cracked tiles — cracked tiles may indicate substrate movement.
  • Excessive lippage — height differences between tiles.
  • Uneven grout — grout lines should be consistent.
  • Grout haze — haze should be removed; if not, contact the installer.

Homeowner Communication Checklist

  • Walk the installation area with the installer.
  • Approve the layout before setting.
  • Confirm grout color before grouting.
  • Confirm cure-time restrictions.
  • Inspect the finished work after grout cure.

Common Misunderstandings

  • Tile is not walkable the same day — cure time is required.
  • Grout lines are not perfectly uniform — slight variation is normal.
  • Tile can crack if the substrate cracks — crack isolation helps.
  • Grout needs sealing — cement grout is porous.

Questions to Ask During the Project

  • How long before I can walk on the floor?
  • What grout color is being used?
  • Are movement joints being provided?
  • When can I seal the grout?
  • What are the care and maintenance instructions?

Suggested Internal Links

  • How Should You Prepare for Tile Flooring Installation?
  • What Should Be Confirmed at the Pre-Installation Review?
  • How Do You Remove Grout Haze from New Tile?
  • How Often Should Grout Be Sealed?

Related Articles

  • What Should Happen at the Final Flooring Installation Walkthrough?
  • How Much Dust, Noise and Odor Should You Expect During Flooring Installation?
  • How Do You Properly Clean Tile and Grout?
  • How Should Natural Stone Floors Be Maintained?

Bottom Line

Tile installation is a multi-day project. Expect surface preparation, crack treatment, layout, cutting, mortar, lippage control, grouting, movement joints, and cure times. The room must remain off-limits for 24-72 hours. Hollow tiles, cracked tiles, excessive lippage, uneven grout, or persistent haze require attention.

Still have questions? Visit your nearest Premier Carpet & Tile showroom to speak with an experienced flooring professional who can help you understand what to expect.

Key considerations

  • Tile installation is a multi-day project requiring 2-5 days depending on complexity
  • Surface preparation, crack treatment, and proper mortar coverage are essential
  • The room must remain off-limits for 24-72 hours during mortar and grout cure
  • Movement joints sealed with silicone are required at perimeters, doorways, and large areas
  • Hollow tiles, cracked tiles, excessive lippage, and uneven grout are warning signs

A common misconception

Many homeowners expect tile installation to be like other flooring — quick and walkable the same day. In reality, tile requires surface preparation, mortar cure time, grout cure time, and movement joints — and the room must remain off-limits for 24-72 hours.