A flat and stable subfloor is the foundation of a successful hardwood installation. First, remove existing flooring materials and inspect the subfloor for rot or moisture damage. Use a long level to identify uneven areas; sand down high spots and use a suitable floor leveling compound to fill low spots. Squeaks should be addressed by screwing down loose subfloor panels to the joists. Finally, clean the area thoroughly with a vacuum to remove all dust and grit. If required by the manufacturer, install the correct underlayment over the prepared surface to provide a moisture barrier and acoustic dampening.

Ask an Expert