Moisture management is the most critical step in successful flooring installation. Before laying any product, technicians must verify the subfloor moisture levels using a calibrated meter. If levels are high, a moisture-mitigating primer or vapor barrier is necessary. Additionally, proper acclimation is required, allowing the flooring to reach equilibrium with the room's temperature and humidity. Maintaining these environmental controls during and after installation prevents board cupping, warping, and adhesive failure.
Ask an ExpertInstallation and Preparation
What steps are required to manage moisture for a new flooring installation?
Managing moisture involves testing the subfloor for moisture content, installing a high-grade vapor barrier if required, ensuring proper ventilation, and allowing flooring materials to acclimate to the environment for 48 to 72 hours before installation begins.