Renovation sequencing is crucial for protecting flooring investments. It is best practice to complete 'top-down' work, such as ceiling and wall finishing, before installing new flooring. This prevents dust, paint, or construction debris from contaminating or damaging the finished surfaces. If replacing carpet, tile, and wood, install in a sequence that minimizes foot traffic over completed rooms. Always finish with trim and baseboard installation, which provides the final, clean transition between the wall and the new floor surface.

Ask an Expert