Project staging requires a structured plan to minimize disruption. Clear a dedicated workspace for installers and remove all fragile items. Acclimatization is essential for many flooring types; store the unopened boxes in the room where they will be installed for at least 48 hours to allow the materials to reach room temperature, preventing expansion or contraction issues after placement.

Ask an Expert