A single large L-shaped stone piece is difficult to carry through doors and can crack at the inside corner. Separating the layout into straight pieces reduces handling stress. The seam location should remain supported and reasonably unobtrusive. Pattern direction and vein movement are planned so the pieces coordinate at the corner.

Key considerations

  • crack resistance
  • seam durability
  • installation safety
  • multiple slab pieces
  • supported joint
  • coordinated pattern
Ask an Expert