What Should You Expect During Luxury Vinyl Plank Installation?

Luxury vinyl plank (LVP) is one of the most popular flooring choices, but proper installation requires careful preparation and precision. After decades of installing LVP in Oklahoma homes, we explain what homeowners should expect during the process.

Project Timeline

  • Duration — typically 1-3 days depending on room size and complexity.
  • Preparation — floor preparation may add time.
  • Cure time — LVP can be walked on immediately; no cure time.
  • Furniture return — furniture can be returned immediately.

Normal Conditions

  • Dust — mild dust from tear-out and floor preparation.
  • Noise — cutting and tapping produce noise.
  • Odor — minimal odor; LVP has no finish odors.
  • Traffic — installers go in and out.

Product Verification

  • Inspect — the installer inspects the product for damage.
  • Lot check — the installer verifies all boxes are from the same lot.
  • Acclimation verification — the installer confirms the product has been acclimated.
  • Quantity — the installer confirms sufficient quantity.

Tear-Out

  • Existing flooring — if tear-out is needed, the installer removes existing flooring.
  • Carpet and padding — always removed.
  • Old tack strips — removed if present.
  • Old adhesive — old adhesive may need scraping.
  • Subfloor inspection — the subfloor is inspected after tear-out.

Floor Preparation

  • Flatness — the subfloor must meet manufacturer flatness tolerances.
  • Patching — wood subfloors may require patching.
  • Self-leveling — concrete may require self-leveling compound.
  • Cleaning — the subfloor must be clean and dry.
  • Cost — floor preparation is typically an additional cost.

Moisture Concerns

  • Concrete testing — moisture testing is required on concrete subfloors.
  • High moisture — high moisture may require a moisture barrier.
  • Manufacturer limits — each manufacturer specifies maximum moisture levels.
  • Documentation — moisture readings should be documented.

Layout

  • Direction — the installer lays planks in the agreed direction.
  • Starting wall — the installer starts at the longest or most visible wall.
  • Staggering — planks are staggered to avoid pattern repetition.
  • Homeowner approval — the homeowner should approve the layout.

Expansion Gaps

  • 1/4-inch gap — LVP requires a 1/4-inch expansion gap around the perimeter.
  • Doorways — expansion gaps at doorways and transitions.
  • Pipes and obstacles — expansion gaps around pipes and obstacles.
  • Coverage — expansion gaps are covered by baseboards or shoe molding.

Cutting

  • Score and snap — LVP can be scored and snapped for straight cuts.
  • Saw cuts — a saw is used for complex cuts and notches.
  • Dust — saw cutting generates dust.
  • Precision — precise cuts are needed around door casings and obstacles.

Transitions

  • Doorways — transitions are installed at doorways between rooms.
  • Flooring changes — transitions where LVP meets other flooring.
  • Height differences — transitions accommodate height differences.
  • Types — T-molding, reducer, end cap, stair nose.

Baseboards

  • Reinstallation — if baseboards were removed, they are reinstalled.
  • Shoe molding — shoe molding is reinstalled or installed new.
  • Caulking — caulk between baseboard and wall if needed.
  • Painting — painting is typically the homeowner's responsibility.

Cleanup

  • Debris — the installer removes tear-out debris and packaging.
  • Sweeping — the installer sweeps the new floor.
  • Disposal — debris is hauled away (if contracted).

When the Floor Can Be Used

  • Immediate — LVP can be walked on immediately after installation.
  • Furniture — furniture can be returned immediately.
  • Appliances — appliances can be moved back immediately, with protection.
  • Cleaning — wait 24 hours before wet cleaning.

Conditions That Require Attention

  • Gaps between planks — planks should be tight; gaps indicate improper installation.
  • Buckling or lifting — indicates improper expansion gaps or moisture.
  • Uneven layout — planks should be staggered and aligned.
  • Damage to planks — inspect for damaged planks.
  • Hollow spots — hollow-sounding areas may indicate subfloor issues.

Homeowner Communication Checklist

  • Walk the installation area with the installer.
  • Confirm the layout and direction.
  • Verify expansion gaps are provided.
  • Inspect the finished work before the installer leaves.
  • Ask about care and maintenance.

Common Misunderstandings

  • LVP is not completely waterproof — moisture can enter seams.
  • LVP requires floor preparation — it is not a quick install.
  • LVP requires expansion gaps — planks can buckle without them.
  • LVP can be walked on immediately — no cure time needed.

Questions to Ask During the Project

  • Was moisture testing performed on the concrete?
  • Are expansion gaps being provided?
  • How are transitions being handled?
  • When can I walk on the floor?
  • What are the care and maintenance instructions?

Suggested Internal Links

  • How Should You Prepare for Luxury Vinyl Plank Installation?
  • What Should Be Confirmed at the Pre-Installation Review?
  • What Is the Best Way to Clean Luxury Vinyl Plank Flooring?
  • Is Luxury Vinyl Plank Really Waterproof?

Related Articles

  • What Should Happen at the Final Flooring Installation Walkthrough?
  • How Much Dust, Noise and Odor Should You Expect During Flooring Installation?
  • How Do You Remove Scratches and Scuff Marks from Luxury Vinyl Flooring?
  • How Can You Make Your New Flooring Last Longer?

Bottom Line

LVP installation typically takes 1-3 days. Expect product verification, tear-out, floor preparation, moisture testing, layout, expansion gaps, cutting, transitions, baseboard reinstallation, and cleanup. LVP can be walked on immediately. Gaps, buckling, or uneven layout require attention.

Still have questions? Visit your nearest Premier Carpet & Tile showroom to speak with an experienced flooring professional who can help you understand what to expect.

Key considerations

  • LVP installation typically takes 1-3 days depending on room size and complexity
  • Floor preparation and moisture testing are required — LVP is not a quick install
  • A 1/4-inch expansion gap around the perimeter is required to prevent buckling
  • LVP can be walked on immediately — no cure time needed
  • Gaps between planks, buckling, or uneven layout are warning signs that require attention

A common misconception

Many homeowners expect LVP installation to be quick and simple because the product is waterproof. In reality, LVP requires careful floor preparation, moisture testing, expansion gaps, and precise cutting — and rushing the process causes gaps, buckling, and warranty voids.

Ask an Expert