Moisture is the leading cause of commercial flooring failure. Standard protocols involve testing the concrete substrate for vapor emission levels before installation begins. If the moisture levels exceed the flooring manufacturer’s specifications, you must apply a moisture mitigation system or moisture barrier. Proper documentation of these tests is vital for maintaining product warranties and long-term adhesion.
Ask an ExpertCommercial Flooring
What specific moisture testing is required before commercial flooring installation?
Commercial flooring installation requires rigorous moisture testing, such as calcium chloride tests or in-situ relative humidity (RH) probes. These determine if the slab meets manufacturer requirements, preventing failure like bubbling, mold, or adhesive release.