Commercial flooring requires rigorous subfloor preparation. Test the concrete for moisture content using industry-standard protocols to prevent adhesive failure or mold. Substrates must be mechanically prepared to be level and smooth. Any cracks or voids must be filled with professional-grade patching compounds that are compatible with the specified commercial adhesive and flooring material.

Ask an Expert