Proper subfloor preparation is mandatory. After cleaning and evaluating the substrate for moisture and integrity, use a long level or straight edge to identify deviations. High spots are removed through sanding or grinding; low areas are filled with high-strength cementitious leveling compounds. Failure to level the substrate causes premature joint stress and potential structural failure of the flooring system.

Ask an Expert