A successful LVP installation depends entirely on the preparation of the subfloor. The surface must be flat within manufacturer-specified tolerances (typically 3/16 inch over 10 feet) to prevent future locking mechanism failure. Concrete subfloors should be tested for moisture and primed if necessary. Wood subfloors must be sound, dry, and securely fastened to prevent squeaks. Acclimating the planks in the installation room for 24-48 hours is usually required to ensure material stability.
Ask an ExpertLuxury Vinyl
What is the standard procedure for site preparation before LVP installation?
Site preparation for LVP involves ensuring the subfloor is clean, dry, and perfectly level. Any depressions or high spots must be addressed using patching compounds or sanding. Proper acclimation of the material to the room's temperature is also a critical step.