Moisture is the primary cause of flooring failure. Before any installation, the substrate must be tested using industry-standard moisture meters or calcium chloride tests. Depending on the results, a moisture-mitigating primer or a high-quality vapor barrier underlayment may be installed to create a protective seal, maintaining a stable environment for the new flooring system.
Ask an ExpertInstallation and Preparation
What is the standard procedure for moisture management under floor installations?
Moisture management involves testing the substrate's moisture content, applying a vapor barrier or sealer if necessary, and ensuring proper ventilation. For wood or laminate, a moisture barrier is essential to prevent moisture migration from the subfloor into the flooring product.