Room conditions serve as a critical variable in the installation timeline. High humidity slows down the evaporation of water in thin-set mortars and self-leveling compounds, extending the cure time before grouting can begin. Conversely, high heat or dry air can cause rapid water loss in cementitious products, leading to a weak bond or premature drying. Proper acclimation of materials to the room temperature—usually between 65°F and 85°F—is required to ensure the floor performs as designed and avoids early failure.